Sculptor’s Studio Addition – Design & Build
- ROSTYSLAV BULAT

- Feb 7
- 1 min read
Location: Waban, MA (Stanley Rd) Budget: $265,000
This design-build project involved the complete development of a new addition serving as a dedicated sculptor's studio. Baybuilders managed the entire lifecycle of the project, starting with pre-construction planning, architectural development, and permitting ("Paper Works").
We executed the full construction of the new structure, including framing, roofing, and siding installation. To ensure a stable and comfortable environment for artwork, we utilized high-performance spray foam insulation and installed a modern HVAC system with heat pump mini-splits. The interior features professional dryway and plaster finishing, fresh paint, and durable hardwood flooring.
Key Features & Materials:
Windows: Pella windows installed to provide optimal natural light for the studio.
Insulation: High-efficiency spray foam insulation for superior climate control.
Systems: New water heating system and HVAC mini-splits.
Fixtures: Plumbing fixtures sourced from Ferguson Supply.
Project Credits:
General Contractor: Bay Builders
Partners: VIP Plumbing, Inspire Development, Gold Tile, Christoforou & Son Electrical

























































Comments